Environment Policy
ENVIRONMENTAL & SUSTAINABLE DESIGN POLICY
Effective date: 1 November 2026
Email: info@gajjarenspace.com | Phone: +91 98258 72072
1. Policy statement
GAJJAR ENSPACE recognises that decisions about space, materials, construction, interiors and project execution can influence resource use, waste generation, comfort and the environmental impact of the built environment.
Our design philosophy—“Envision → Enhance → Enspace”—encourages us to explore the potential of each space rather than rely automatically on familiar solutions. We seek, where appropriate to the project, to consider environmental performance alongside spatial quality, material expression, durability, function and the experience of people using the space.
2. Scope
This policy describes the environmental considerations that GAJJAR ENSPACE intends to integrate into its own practice and, where included in an agreed scope, into design development, interior design, procurement advice and project execution coordination. It applies to our professional activities and to the extent reasonably practicable to the project teams and suppliers with whom we work.
This policy is an expression of approach and intent. It is not a certification, environmental product declaration, guarantee of energy or water savings, or representation that every project is sustainable or compliant with every environmental requirement.
3. Design considerations
Where relevant, project teams may consider: use of daylight and opportunities to reduce unnecessary artificial lighting; natural ventilation and passive comfort strategies where climate, site, safety and building systems permit; efficient planning and use of existing built fabric; durable, repairable and maintainable materials; responsible material selection and sourcing; reduction of unnecessary finishes and construction waste; efficient use of water and energy; indoor environmental quality, including ventilation and material emissions; and design choices that support long-term adaptability and reduce premature replacement.
These considerations must be evaluated against the project’s location, climate, orientation, site conditions, applicable codes, client brief, budget, technical feasibility, accessibility, health and safety requirements.
4. Materials and procurement
Where the scope permits, we may encourage clients and project teams to consider locally available materials, recycled or recyclable content, responsibly sourced products, low-emission finishes, durable products and suppliers able to provide relevant technical or environmental information.
Material selection remains subject to performance, availability, cost, maintenance, fire and safety requirements, applicable standards and client approval. We do not make environmental claims about a product unless there is reliable information supporting the claim.
5. Construction, interiors and waste
For projects involving execution or coordination, and where the agreed role allows, we seek to encourage orderly material planning, accurate measurement, reuse of suitable existing elements, segregation of waste, responsible disposal through authorised channels and avoidance of unnecessary packaging and wastage.
Construction and demolition waste, solid waste, plastic waste, e-waste, batteries and hazardous waste must be handled by the responsible project parties in accordance with applicable Indian central, state and local requirements, including the Environment (Protection) Act, 1986 and applicable waste-management rules. The client, contractor, waste generator, occupier and authorised waste handler retain the duties imposed on them by law; this policy does not transfer those statutory duties to GAJJAR ENSPACE.
6. Legal and regulatory compliance
Projects must be assessed against applicable local development control regulations, building bye-laws, fire and life-safety requirements, energy-conservation requirements, environmental permissions and waste-management obligations, as relevant to the site and project. The specific approvals and statutory responsibilities must be identified in the project appointment and by the competent professionals and authorities.
GAJJAR ENSPACE will endeavour to perform the services expressly included in its written appointment with reasonable professional care. This policy does not replace statutory approvals, technical certifications, environmental clearances, specialist advice or legal compliance reviews.
7. Collaboration and continuous improvement
We encourage clients, consultants, contractors, suppliers and project teams to discuss practical environmental opportunities early in the design process. We may review this policy as our practice, project experience, available materials, technology and applicable law develop.
Where measurable environmental targets are agreed for a particular project, they should be recorded separately in the project brief or appointment, together with the measurement method, assumptions, responsible party and limitations.
8. Reporting concerns
Questions or suggestions relating to this policy may be sent to:
GAJJAR ENSPACE
Email: info@gajjarenspace.com
Phone: +91 98258 72072
9. Review
This policy is effective from 1 November 2026 and may be reviewed periodically. The latest version should be published on the website.





